Menu
Your Cart

2800W AC110-220V 12A Power Supply with 0-600°C/1000°C Overload AlFoot Switch Integrated Induction Heating Machine with Water and Cold Air Module

2800W AC110-220V 12A Power Supply with 0-600°C/1000°C Overload AlFoot Switch Integrated Induction Heating Machine with Water and Cold Air Module
2800W AC110-220V 12A Power Supply with 0-600°C/1000°C Overload AlFoot Switch Integrated Induction Heating Machine with Water and Cold Air Module
2800W AC110-220V 12A Power Supply with 0-600°C/1000°C Overload AlFoot Switch Integrated Induction Heating Machine with Water and Cold Air Module
2800W AC110-220V 12A Power Supply with 0-600°C/1000°C Overload AlFoot Switch Integrated Induction Heating Machine with Water and Cold Air Module
2800W AC110-220V 12A Power Supply with 0-600°C/1000°C Overload AlFoot Switch Integrated Induction Heating Machine with Water and Cold Air Module
2800W AC110-220V 12A Power Supply with 0-600°C/1000°C Overload AlFoot Switch Integrated Induction Heating Machine with Water and Cold Air Module
2800W AC110-220V 12A Power Supply with 0-600°C/1000°C Overload AlFoot Switch Integrated Induction Heating Machine with Water and Cold Air Module
2800W AC110-220V 12A Power Supply with 0-600°C/1000°C Overload AlFoot Switch Integrated Induction Heating Machine with Water and Cold Air Module
2800W AC110-220V 12A Power Supply with 0-600°C/1000°C Overload AlFoot Switch Integrated Induction Heating Machine with Water and Cold Air Module
$810.95
Ex Tax: $810.95
  • Stock: In Stock
  • Model: EB0044452
  • SKU: EB0044452

Available Options



Introduction:
 
This product is a small power induction heating machine with AC110V-220V power supply. 
It can be used for heating and quenching of small iron metal materials. The maximum temperature of matching 70mL graphite crucible can reach 1600 degrees Celsius.
Easy to melt iron, copper, gold, silver and aluminum.
Update: May 26, 2021 (Update information is as follows)
 
Panel Description:
 
1. Total power switch
2. AC110V-AC220V input interface
3. Infrared temperature sensor interface
4. Water cold water pipes
5. Main display
6. Overload indicator
7. Heating indicator
8. Output interface
9. Continuous heating switch
10. Reset switch
11. Foot switch interface
12. Fuse
13. Thermostat
14. Cooling fan
15. LCD screen changed to color screen
16. The buttons are moved from the bottom to the top for easier operation
 
Product parameters:
 
1. Rated voltage: AC220V
2. Rated maximum input current: 15A
3. Main board rated voltage: DC48V
4. Main board rated maximum current: 55A
5. Host weight: 7KG
6. Crucible capacity: 70ml
7. Heating ring inner diameter: 60mm
8. External size: 380mm*150mm*210mm
 
Preparation before use:
 
1. The first use of the heating coil is not installed, and the user needs to use the tool to install it;
2. After the installation is completed, prepare a basin of water and insert both heat into the water. If conditions permit, it is recommended to use cold water to enter the hot water to drain directly.
3. Before powering up, make sure that the main power switch is in the off position and insert the input power cable into the 110~250VAC input interface.
4. Press the front main power switch to supply power to the internal power supply. Wait about 5 seconds for the main display to light up, and the pump and fan to start.
5. Observe the water leakage near the detachable heating coil linker. If there is water leakage to turn off the power, use a tool to tighten the connector screws until there is no water leakage (watertight test is carried out at the factory)
6. Set the alarm current according to the actual use requirements. The default alarm current is 58A.

Steps for usage:
 
1. Make sure the back main power switch is off;
2. Turn on the main power switch and wait for about 5 seconds. After the power supply is stable, the fan and water pump are running. The main display brightness voltage is 48V.
3. Press the continuous heating switch, the green heating indicator lights up, or use the foot switch. After the pedal is pressed, the heating indicator lights up, and then turns off when it is released;
4. Press the reset switch after the end of use, wait about 1 minute before turning off the main power switch.
 
Precautions for use:
 
1. Under any circumstances, you must follow the first power switch before waiting for the fan and pump to work, then turn on the heating, otherwise there is a risk of burning the motherboard (this item must be absolutely observed)
2. When shutting down, please press the reset switch first, wait for one minute and then turn off the main power switch. The purpose of this operation is to let the system cool down.
3. If there are conditions, the water circulation cooling can be changed to the non-circulating water cooling directly discharged from the cold water and hot water, which is beneficial to reduce the system temperature.
4. Multi-function display can display the power of the system and the temperature of the motherboard in real time. When the power continues to be greater than 2800W or the motherboard is greater than 90°C, the system should be shut down. The heated object may overload the system. This can be set to the machine by setting the alarm current. Set alarm protection to automatically cut off heating;
5. When any one of the cooling fan and the water circulation system is not working, the main power supply must be turned off and the work must not be continued. Contact the manufacturer to solve the problem;
6. The cooling fan port on the top and the heat dissipation air inlet of the power supply must not be blocked, otherwise it will affect the heat dissipation of the system;
7. The rated working voltage is AC220V, and the AC110V power will be halved.
 
Common problem solving:
 
1. The system power-on fan water pump does not work, can not be heated, the fuse replacement indicator lights up, indicating that the fuse is blown, it may be caused by overload, just replace the fuse, the fuse parameter is 6*30/15A;
2. Please contact the manufacturer for specific problems.
Annex 1: Power Meter Instructions
Button click: face switch
Double click on the button: Set plus
Button three hits: set minus
Press and hold long: Continue to add or subtract
 
Annex 2 Thermostat Instructions:
 
The temperature controller can realize temperature control. (Generally set to the upper limit alarm). Press and hold the SET button to enter the password 3000. Press SET, AL2 is the upper limit temperature, HAL2 is the lower line start temperature difference, d2 is the action delay, set to 0. After the setting is completed, long press SET to the main interface (the whole setting process ignores the parameter with the tail number 1);

Package includes:

1 x Power supply with 0-600°C/0-1000°C Temperature control (optional)
1 x Power Cable
1 x Crucible
1 x Coil
1 x 
Thermostat 
1 x Overload Alarm
1 x Foot Switch
 


2800W-AC110-220V-12A-Power-Supply-with-0-600degC1000degC-Overload-Alarm-Foot-Switch-Integrated-Induc-1567275

2800W-AC110-220V-12A-Power-Supply-with-0-600degC1000degC-Overload-Alarm-Foot-Switch-Integrated-Induc-1567275

2800W-AC110-220V-12A-Power-Supply-with-0-600degC1000degC-Overload-Alarm-Foot-Switch-Integrated-Induc-1567275

2800W-AC110-220V-12A-Power-Supply-with-0-600degC1000degC-Overload-Alarm-Foot-Switch-Integrated-Induc-1567275

2800W-AC110-220V-12A-Power-Supply-with-0-600degC1000degC-Overload-Alarm-Foot-Switch-Integrated-Induc-1567275


Write a review

Note: HTML is not translated!
Bad Good

Shipping Time


After you successfully placed an order at RenhotecIC.com, you will receive a confirmation email with your invoice. Once your order is shipped, you will be emailed with the tracking information of your package. Also, you can choose your preferred shipping method during the checkout process. Kindly advise: please select DHL/FedEx if you need our product urgently.

The timeline of the whole shipping process is shown below:

img

The total delivery time is calculated from the time your order is successfully placed to the time received. Total delivery time is broken down into processing time and shipping time.

Processing time: The time it takes to prepare your item(s), includes preparing your items, performing quality inspections, and packaging for shipment. Normally, the processing time is 1-3 days (Only include Monday to Saturday ) after getting your order.

Shipping time: The time for your item(s) to travel from our warehouse to your destination. The shipping time depends on the shipping method you chose. Please refer to the shipping rate section for details. 


Shipping Rates


You could choose the shipping method based on your preference during checkout, different shipping methods will apply different rates and shipping times. Please check the following chart for detail:


Shipping MethodShipping RatesShipping Times
Flat Shipping (Promotion)
$10About 5-30 Working Days to Worldwide (Only include Monday to Saturday )

Standard Express(0.5KG starting price listed)

Based On WeightsAbout 5-15 Working Days to Worldwide (Only include Monday to Saturday )

Priority Express (0.5KG starting price listed)

Based On WeightsAbout 3-7 Working Days to Worldwide (Only include Monday to Saturday )

In addition, the transit time depends on where you're located, the shipping method you choose, and where your package comes from. We will keep you informed of any problems here to help you get your order as soon as possible. 

If you want to know more information, please contact the customer service by contact form or sales@renhotecic.com. We will settle your problem as soon as possible. Enjoy shopping!